PORTUGAL ESTATE — SYSTEMS MONITOR

--
Connected
Off-Grid
Connected
Connectedw/o trading
Heating
Cooling

ENERGY & RESOURCE FLOW — REAL-TIME

SYSTEM HISTORY
PV Output
Battery SoC
Sand Battery
Tank B (DHW)
Total Load (excl. Sand Battery)
Indoor Temp
Grid Flow
Borehole Temp
GSHP Power
Parabolic CSP (Roof)
Biogas Stored
LPG Boiler
Diesel Gen
Elec. Heater
Elec. Price

Environment

DAY
☀️
Ambient Temp
22.4 °C
Solar Irradiance
856 W/m²
Sunrise / Sunset
06:32 / 20:18
Day Length
13h 46m

PV Array (40 kWp)

GENERATING
Current Output
28.4 kW
Today's Yield
142.8 kWh
Panel Temp
38.2 °C
Efficiency
18.4 %

Na-Ion Battery (165 kWh)

CHARGING
State of Charge
78.3 %
Power Flow
+6.2 kW
Stored Energy
129.2 kWh
Cell Temp
24.1 °C
Cycles Today
0.4
Voltage
52.1 V

Sand Battery (100 ton)

CHARGING
Core Temperature
412 °C
Charge Level
82.4 %
Thermal Input
12.6 kWth
Thermal Output
0.0 kWth
Shell Temperature
68 °C
Standby Loss
0.18 kWth

GSHP & Boreholes

HEATING
Compressor Power
4.8 kW
COP
4.2
Thermal Output
20.2 kWth
Flow Temp
38.4 °C
Return Temp
32.1 °C
Brine Temp (avg)
12.8 °C

Parabolic CSP Collectors

ACTIVE
Thermal Output
18.6 kWth
Focus Temp
680 °C
To Sand Battery
0.0 kWth
Today Yield
86.4 kWhth

Tank A — Buffer (~35°C)

ACTIVE
Temperature
34.8 °C
Volume
2200 L
Fill Level
88 %
Heat to UFH
14.2 kWth
34.8°C

Tank B — DHW (~55°C)

ACTIVE
Temperature
54.2 °C
Volume
1800 L
Fill Level
90 %
DHW Draw
4.8 kWth
54.2°C

Electrical Loads

LIVE
Total Demand
8.4 kW
Domestic
3.2 kW
GSHP Compressor
4.8 kW
Pumps & RO/UV
0.4 kW
Today Consumed
68.2 kWh
Excess to Sand
12.6 kW
Elec. Heater
0.0 kW

Electrical Consumers

LIVE

Water Systems

ACTIVE
Non-Potable Tank
78 %
Potable Tank
85 %
Well Pump
ON 1.5 kW
RO/UV Status
Active 0.5 kW
Daily Use (est.)
2,400 L
Pressure
3.2 bar

Anaerobic Digester (10-15 m³)

PROCESSING
Digester Temp
35.2 °C
Fill Level
62 %
Blackwater In
5.0 L/h
Retention Time
28 days
Biogas Rate
0.42 m³/h
Biogas Stored
4.8
Biogas Today
2.4
pH (est.)
7.1
Methane Content
62 %
Overflow to Wetland
0.0 L/h
Wetland Status
Normal
Greywater Flow
1.2 L/min

Pasteurizer (500-1000L)

STANDBY
Status
Standby
Batch Temp
22.0 °C
Target Temp
70 °C
Batch Volume
0 L
Batch Progress
Heat Source
Tank Temp
25 °C
Tank Heat
0.0 kWth
Heating Power
0.0 kWth
Biogas Consumed
0.0
Hold Time
Batches Today
0
Fertilizer Out
0 L today
Fert. Tank
0/600 L

Backup Systems

STANDBY
Diesel Generator
Standby
Diesel Tank
92 %
LPG Boiler
Standby
LPG Tank
88 %
Gen Hours
0.0 h today
LPG Burn
0.0 kg today

Underfloor Heating

ACTIVE
Mode
Heating
Floor Temp (avg)
22.8 °C
Flow / Return
35.0 / 30.2 °C
Indoor Temp
21.4 °C
Zones Active
6 / 8
Satellite Draw
0.0 kWth
Thermal (3-day avg)
0 kWhth/day

Rammed Earth Wall (IRE Sandwich)

INSULATING
Wall Cross-Section (Top-Down) — Heat Map
← Exterior 20cm Earth  |  10cm Cork  |  20cm Earth Interior →
Temperature Profile Through Wall
Outer Surface
15.0 °C
Cork Core (avg)
18.5 °C
Inner Surface
21.0 °C
U-value (live)
0.45 W/m²K
U-value (3-day avg)
0.45 W/m²K
Heat Flux (inner)
+2.3 W/m²
Heat Loss
0 Wh/m²/day
Thermal Lag
~8 hours

Electric Vehicles

CHARGING
Connected
2 / 3 cars
Total EV Battery
160 kWh
Combined SoC
72 %
Charge Power
7.4 kW
Driving Today
28 kWh used
Status
Charging from PV

Stirling Engine (Backup)

STANDBY
Electrical Output
0.0 kW
Today Yield
0.0 kWh
CSP Temp / Eff.
Sand Temp / Eff.

Grid & Municipal

DISCONNECTED
Grid Connection
Connected
Power Flow
0.0 kW
Imported Today
0.0 kWh
Exported Today
0.0 kWh
Buy Price
14.0 c/kWh
Sell Price
7.0 c/kWh
Cost Today
0.00
Revenue Today
0.00
Municipal Water
Available
Muni Water Used
0 L today

Electricity Market

PEAK
Price History & Trading Activity
Buy Price Sell Price Importing Exporting Na-Ion SoC Solar Output
Buy Price
14.0 c/kWh
Sell Price
7.0 c/kWh
Trading
Idle
Trade Profit Today
0.00
Net € This Month
0.00
Net € Last Month
0.00
Self-Sufficiency: 100%
Energy Balance: +14.2 kW
Grid:
CO₂ Saved Today: 42.8 kg
Uptime: 99.97%
Alarms: 0

ASSUMED SYSTEM SCALING

PV Array

Peak capacity40kWp
Panel area~200
Panels~100 × 400W
LocationRemote, ground-mount
Est. cost€32,000 – €48,000

Na-Ion Battery

Capacity165kWh
Nominal voltage48V
Max charge25kW
Max discharge30kW
Est. cost€50,000 – €75,000

Sand Battery (Seasonal)

Mass150tonnes
Volume~95
Pit footprint~24 @ 4 m deep
Temp range50 – 500°C
Thermal capacity~15,750kWh
Standby loss @ 400°C~1.5kW
Est. cost€70,000 – €100,000

Diesel Generator (Backup)

Power15kW
Fuel consumption~3L/h diesel
Footprint~8
Est. cost€8,000 – €15,000

IRE Wall Envelope

Total thickness50cm
Outer earth20cm (rammed)
Cork core10cm (HD Portuguese)
Inner earth20cm (thermal mass)
Earth k1.0W/mK
Cork k0.045W/mK
Target U-value~0.45W/m²K
Thermal lag~8hours
Est. cost€15,000 – €25,000 (cork)

GSHP (Geothermal)

Boreholes8 × 100–150m deep
Borehole spacing5–6m
Ground temp14°C
COP heating3.5 – 4.5
COP cooling4.5
Est. cost€25,000 – €40,000

Parabolic CSP (Roof)

Aperture area40
Focus temp600–700°C
Efficiency~55%
Peak output~22kW_th
HTFHot gas (air)
Priority 1Tank B DHW via HX
Priority 2Sand Battery charging
Priority 3Stirling engine (backup)
Est. cost€20,000 – €40,000

Stirling Engine (Backup)

TypeFree-piston
Electrical output9–25kW_e
Hot side temp600–700°C
Efficiency~28%
Activates whenSand full AND Tank B full
Output toNa-Ion Battery
Est. cost€15,000 – €30,000

Tank A (Buffer)

Volume2,500L
Temp range18 – 42°C
SourceGSHP
ServesUFH · cascades → Tank B
Est. cost€3,000 – €5,000

Tank B (DHW)

Volume2,000L
Temp range30 – 65°C
SourcesCSP (via HX) · Sand · LPG
ServesDHW (taps, showers)
Est. cost€2,500 – €4,500

LPG Boiler (Backup)

Power20kW_th
Tank2 (~1,050 kg)
Backup duration~2months winter
Est. cost€3,500 – €6,000

Biogas → Tank B Heating

Storage12
Burner power8kW_th
Activates when>80% full
PriorityBefore sand battery top-up
Surplus mode (>95% full)Boosts Tank B to 60°C

Biogas Cooking

Cooking power1.5kW_th (hob burners)
Activates when>60% full
Active hours7–9, 11–14, 18–21
Elec. savings~1kW_e (hob substitution)

Water Supply

Borehole pump300L/h · 1.5 kW
Non-potable tank5,000L
RO/UV throughput40L/h · 0.5 kW
Potable tank2,000L
Per-person — potable~30L/day
Per-person — non-potable~70L/day
Est. cost€20,000 – €35,000

Wastewater

Blackwater per person~30L/day
Greywater split60% of usage
Wetland reed bed~35

Anaerobic Digester

Volume12 (12,000 L)
Capacity20–30people
Target temp35°C (mesophilic)
Biogas yield~0.16m³/person/day
Retention time~22days
Est. cost€25,000 – €45,000

Biogas Storage

Capacity12
Calorific value~5kWh/m³ (effective)
Buffer~7days production
Est. cost€5,000 – €10,000

Pasteurizer

Batch size300L
Target temp70°C for 60 min
Burner power3kW_th
Maintenance power1.5kW_th
Immersion backup2kW_e (50→70°C)
Est. cost€8,000 – €15,000

Local Hot Water Tank

Volume500L
Solar collector5 flat-plate
Target temp~50°C
ServesDigester HX · Pasteurizer
Est. cost€2,000 – €4,000

Fertilizer Storage

Tank volume600L (2 batches)
Garden drain~0.25L/h
OutputFood-grade fertilizer
Est. cost€1,000 – €2,500

EV System (V2G)

Default capacity120kWh (2 cars @ 60 kWh)
Charge rate7.4kW/car (32A)
V2G discharge7kW/car
Min SoC (V2G floor)60%
Est. cost (infra)€3,000 – €6,000

Building

Communal house387m²/floor × 3
Default living area774 (2 floors)
Default residents10people
Design capacity20–30people
InsulationIRE Sandwich (U-value ~0.45)
Cork Core€15k – €25k
Shell + fit-out€2.15M – €2.78M

Total Technology Package

PV + Battery + Sand€152k – €223k
GSHP + Thermal€37k – €60k
Water + Waste€61k – €111k
Backup (Gen + LPG)€12k – €21k
Communal house build€2.15M – €2.78M
TOTAL MOTHERSHIP~€2.5M – €3.4M
+ 4 satellite houses€1.0M – €1.4M
FULL ESTATE~€3.6M – €4.9M